High-Rise Condo Deficiency Resolution

Comprehensive deficiency repairs for a Downtown Vancouver high-rise condo. We resolved all outstanding items from the original construction, including drywall issues, flooring problems, and incomplete hardware installation.

Modern condo living space after repairs

Living area with completed finishing work

Kitchen with properly installed hardware

Kitchen with all hardware properly installed and aligned

Flooring transition detail

Properly installed flooring transition at balcony door

The Challenge

The condo owner had been dealing with their developer for over a year trying to get construction deficiencies resolved. Items included uneven drywall finishing, gaps in flooring transitions, missing hardware, and paint touch-ups. The developer's trades kept scheduling and then not showing up.

Our Solution

We conducted a thorough walkthrough and documented all deficiencies. Working efficiently within condo building access hours, we completed all repairs in a single day. The owner finally had the move-in quality finish they were promised.

Background

New construction doesn’t always mean perfect construction. This Downtown Vancouver condo looked great at first glance, but a careful inspection revealed numerous small issues, the kind of things that should have been caught before occupancy.

Issues Identified

During our walkthrough, we documented:

  • Drywall: Visible seams, nail pops, and uneven texture in multiple areas
  • Paint: Touch-ups needed throughout, including two mismatched sections
  • Flooring: Gaps at transitions, squeaky boards, and an uneven threshold
  • Hardware: Several cabinet doors not closing properly, loose handles
  • Fixtures: Bathroom accessories not level, mirror not centered

The Fix

With one multi-trade visit, we addressed every item:

  • Skim-coated and repainted affected drywall areas
  • Matched and completed all paint touch-ups
  • Reinstalled flooring transitions with proper expansion gaps
  • Adjusted and tightened all cabinet hardware
  • Repositioned bathroom fixtures and mirror

Outcome

The owner finally has the finished product they paid for. A year after move-in, but done right.